20121117_820121117_72Construction continues on the building. The roof panels were lowered into place and more plywood siding went up. Next is finishing the roof. Soon the rough building will be finished and the heating and finishing work can begin. Concrete was also poured for the foundation of the Hillaire Entrance Pole. The pole is slated to go up later in the week.20121117_7520121117_78